FIELD GUIDE / CT-QDO v1.0

Follow the change.
Read the signal.
Own the quality.

Study quality throughout the DevOps value stream with a real Playwright suite ↗. Inspect its CI triggers, Chromium run and report artifacts. Then use four syllabus chapters, a question bank and practical calculators to distinguish tested evidence from future work.

4 chapters
with source-backed exercises
0 / 104
flashcards mastered
0 / 72
questions answered
Not taken
best practice score
PROJECT WALKTHROUGHPULL REQUEST → TEST → ARTIFACT

A passing CI job answers a specific question.

The project's workflow runs browser tests on pushes and pull requests to its main branches. It installs Chromium, executes the test:ci command, and retains a report and test results. Follow the chain before making a claim about release readiness.

01 / CHANGEPull request

Source changes trigger a reviewable CI run.

02 / CHECKChromium tests

The command selects one configured browser project.

03 / EVIDENCESaved artifacts

Results help diagnose a failure after the run.

Read the workflow in GitHub ↗

Syllabus Study Guide

Four chapters aligned to CT-QDO v1.0, with applied notes on the linked CI workflow and test evidence.

Interactive Flashcards

Study delivery signals, continuous testing, exploratory charters and release evidence with focused prompts.

Practice Question Bank

Practise with 72 questions, including 12 new source-based quality and delivery scenarios.

Timed Practice Set

Use a timed 40-question learning set with flags and chapter feedback. The site gives each question equal weight.

Delivery Workbench

Calculate delivery signals and a sample availability budget; explore gate outcomes without implying a deployment.

Study Glossary

Search 45 independent study definitions across the four chapters.

Certification Standard

ISTQB® CT-QDO (Quality in DevOps)

Exam Question Count

40 questions / 45 points

Time Allocated

60 minutes (check accommodations with your provider)

Passing Score

30 of 45 weighted points

Cognitive Levels

K1 (Remember), K2 (Understand), K3 (Apply)

Official CT-QDO v1.0: 40 questions, 45 weighted points, 30 points to pass and 60 minutes. This site scores each question equally and uses a separate 70% practice target. Verify with ISTQB ↗

Syllabus Study Guide & Notes

Four syllabus chapters with source-backed examples and review prompts.

Flashcards (104 Cards)

Click the card (or press Spacebar) to flip. Use arrow keys to navigate.

Card 1 of 104 Space = flip · Right arrow = next · Left arrow = previous
Ch 1: Foundations Click to see answer
Category: Concept Front
Answer & Explanation Click to see question
Study explanation Back

Practice Question Bank with Explanations

72 independent practice questions with chapter filters and explanations.

72 Questions

CT-QDO Timed Practice

Choose a timed set to check your understanding. These independent practice questions use equal-weight scoring.

40-question practice
40 questions • 60 minutes • learning target: 28 correct. Official questions use weighted points.
Quick review
10 questions • 15 minutes for focused review.
Scenario practice
20 K2 and K3 questions • 35 minutes for applied practice.

Selected Mode

40-question practice set

Question Count

40 Questions

Time Allocated

60 Minutes

Practice Target

70% correct (28/40 on full set)

Practice rules

  • Each practice question has one correct answer out of four options.
  • You can flag questions to review before final submission.
  • Answer every question to make the chapter feedback useful.
  • After submission, see your practice score and chapter breakdown. This is not an official exam result.

Official pass rule: 30 of 45 weighted points. This tool cannot award certification. See ISTQB details ↗

Delivery and Quality Workbench

Follow a real CI workflow, then use sample data to explore delivery signals, SLO allowance and gate decisions.

PLAYWRIGHT / WORKFLOW REVIEW

Read what ran. Record what it proves.

The playwright-automation-exercise project ↗ supplies a concrete CI example. Inspect the actual command and output before extending it with your own release gates.

01 / TRIGGER

Push or pull request

The workflow listens to main and master and supports manual dispatch. A test run is linked to a code change.

Open workflow ↗
02 / EXECUTION

Chromium only in CI

The job installs Chromium and calls test:ci. Its package script selects the chromium Playwright project.

Open package scripts ↗
03 / ARTIFACT

Report and results

The workflow retains the HTML report and test-results directory even when tests fail, supporting later diagnosis.

Read artifact steps ↗
EXECUTED COMMANDS / REVIEWED COMMITView source ↗
npm ci
npx playwright install --with-deps chromium
npm run test:ci    # playwright test --project=chromium --workers=2
REVIEW EXERCISE
What happens after a failed browser test?

Use the test-results artifact and HTML report to inspect the case, then check the trace and screenshot settings. The workflow uploads artifacts whether the test step passes or fails.

Can a green run prove a production deployment?

No. The linked workflow runs tests only. A deployable build, environment, production rollout and release decision need separate evidence.

Which gate would you add first?

Start from a specific risk. Name the check, inputs, threshold, artifact and owner. For cross-browser risk, run the required engines explicitly; for a release risk, define a production signal and response.

Project boundary: The calculations below use illustrative input. They do not read the linked repository or trigger its CI, deployment or production systems.

Delivery signals

Five current DORA measures, calculated from your sample production records.

Use one application and one observation period. The initial values are illustrative; the linked test workflow has no production deployments. Read DORA’s current metric definitions ↗

Deployment frequency—
Change lead time—
Change failure rate—
Failed deployment recovery—
Deployment rework rate—

Availability budget example

A downtime allowance for a defined time-based SLO.

This illustration treats each minute of downtime equally. A request-based SLI needs request data. The result does not enact a release freeze. Read Google’s SLO guide ↗

Allowance—
Remaining—
Used—
Review—

Policy belongs to the service’s stakeholders. An exceeded budget calls for the agreed response, which may differ between services.

Quality gate design exercise

Choose example results and see the outcome of each proposed check.

These are hypothetical gates and thresholds. The linked workflow runs Chromium browser tests and saves artifacts; it does not execute the unit, coverage, security or canary checks shown here.

Unit result
NOT EVALUATED
Coverage
NOT EVALUATED
Security findings
NOT EVALUATED
Canary signal
NOT EVALUATED
Release review
HUMAN REVIEW
Example review—

Quality in DevOps Glossary

Independent study definitions for DevOps quality and delivery.